Sunday, 18 September 2011
SOFTWARE PROCESS MODELS
To solve actual problems in an industry setting, a software engineer or a team of engi-
neers must incorporate a development strategy that encompasses the process, meth-
ods, and tools layers described in Section 2.1.1 and the generic phases discussed in
Section 2.1.2. This strategy is often referred to as a process model or a software engi-
neering paradigm. A process model for software engineering is chosen based on the
nature of the project and application, the methods and tools to be used, and the con-
trols and deliverables that are required. In an intriguing paper on the nature of the
software process, L. B. S. Raccoon [RAC95] uses fractals as the basis for a discussion
of the true nature of the software process.
neers must incorporate a development strategy that encompasses the process, meth-
ods, and tools layers described in Section 2.1.1 and the generic phases discussed in
Section 2.1.2. This strategy is often referred to as a process model or a software engi-
neering paradigm. A process model for software engineering is chosen based on the
nature of the project and application, the methods and tools to be used, and the con-
trols and deliverables that are required. In an intriguing paper on the nature of the
software process, L. B. S. Raccoon [RAC95] uses fractals as the basis for a discussion
of the true nature of the software process.
All software development can be characterized as a problem solving loop (Figure
2.3a) in which four distinct stages are encountered: status quo, problem definition,
technical development, and solution integration. Status quo “represents the current
state of affairs” [RAC95]; problem definition identifies the specific problem to be solved;
technical development solves the problem through the application of some technol-
ogy, and solution integration delivers the results (e.g., documents, programs, data,
new business function, new product) to those who requested the solution in the first
place. The generic software engineering phases and steps defined in Section 2.1.2
easily map into these stages.
This problem solving loop applies to software engineering work at many different
levels of resolution. It can be used at the macro level when the entire application is
considered, at a mid-level when program components are being engineered, and
(b)
2.3a) in which four distinct stages are encountered: status quo, problem definition,
technical development, and solution integration. Status quo “represents the current
state of affairs” [RAC95]; problem definition identifies the specific problem to be solved;
technical development solves the problem through the application of some technol-
ogy, and solution integration delivers the results (e.g., documents, programs, data,
new business function, new product) to those who requested the solution in the first
place. The generic software engineering phases and steps defined in Section 2.1.2
easily map into these stages.
This problem solving loop applies to software engineering work at many different
levels of resolution. It can be used at the macro level when the entire application is
considered, at a mid-level when program components are being engineered, and
(b)
even at the line of code level. Therefore, a fractal4 representation can be used to pro-
vide an idealized view of process. In Figure 2.3b, each stage in the problem solving
loop contains an identical problem solving loop, which contains still another prob-
lem solving loop (this continues to some rational boundary; for software, a line of
code).
Realistically, it is difficult to compartmentalize activities as neatly as Figure 2.3b
implies because cross talk occurs within and across stages. Yet, this simplified view
leads to a very important idea: regardless of the process model that is chosen for a
software project, all of the stages—status quo, problem definition, technical develop-
ment, and solution integration—coexist simultaneously at some level of detail. Given
the recursive nature of Figure 2.3b, the four stages discussed apply equally to the
analysis of a complete application and to the generation of a small segment of code.
Raccoon [RAC95] suggests a “Chaos model” that describes “software develop-
ment [as] a continuum from the user to the developer to the technology.” As work
progresses toward a complete system, the stages are applied recursively to user needs
and the developer’s technical specification of the software.
In the sections that follow, a variety of different process models for software engi-
neering are discussed. Each represents an attempt to bring order to an inherently
chaotic activity. It is important to remember that each of the models has been char-
acterized in a way that (ideally) assists in the control and coordination of a real soft-
ware project. And yet, at their core, all of the models exhibit characteristics of the
Chaos model.
.
vide an idealized view of process. In Figure 2.3b, each stage in the problem solving
loop contains an identical problem solving loop, which contains still another prob-
lem solving loop (this continues to some rational boundary; for software, a line of
code).
Realistically, it is difficult to compartmentalize activities as neatly as Figure 2.3b
implies because cross talk occurs within and across stages. Yet, this simplified view
leads to a very important idea: regardless of the process model that is chosen for a
software project, all of the stages—status quo, problem definition, technical develop-
ment, and solution integration—coexist simultaneously at some level of detail. Given
the recursive nature of Figure 2.3b, the four stages discussed apply equally to the
analysis of a complete application and to the generation of a small segment of code.
Raccoon [RAC95] suggests a “Chaos model” that describes “software develop-
ment [as] a continuum from the user to the developer to the technology.” As work
progresses toward a complete system, the stages are applied recursively to user needs
and the developer’s technical specification of the software.
In the sections that follow, a variety of different process models for software engi-
neering are discussed. Each represents an attempt to bring order to an inherently
chaotic activity. It is important to remember that each of the models has been char-
acterized in a way that (ideally) assists in the control and coordination of a real soft-
ware project. And yet, at their core, all of the models exhibit characteristics of the
Chaos model.
.
THE SOFTWARE PROCESS
A software process can be characterized as shown in Figure 2.2. A common process
framework is established by defining a small number of framework activities that are
applicable to all software projects, regardless of their size or complexity. A number
of task sets—each a collection of software engineering work tasks, project milestones,
framework is established by defining a small number of framework activities that are
applicable to all software projects, regardless of their size or complexity. A number
of task sets—each a collection of software engineering work tasks, project milestones,
work products, and quality assurance points—enable the framework activities to be
adapted to the characteristics of the software project and the requirements of the
project team. Finally, umbrella activities—such as software quality assurance, soft-
ware configuration management, and measurement2—overlay the process model.
Umbrella activities are independent of any one framework activity and occur through-
out the process.
In recent years, there has been a significant emphasis on “process maturity.” The
Software Engineering Institute (SEI) has developed a comprehensive model predi-
cated on a set of software engineering capabilities that should be present as organ-
izations reach different levels of process maturity. To determine an organization’s
current state of process maturity, the SEI uses an assessment that results in a five
point grading scheme. The grading scheme determines compliance with a capability
maturity model (CMM) [PAU93] that defines key activities required at different levels
of process maturity. The SEI approach provides a measure of the global effectiveness
of a company's software engineering practices and establishes five process maturity
levels that are defined in the following manner:
Level 1: Initial. The software process is characterized as ad hoc and occa-
sionally even chaotic. Few processes are defined, and success depends on indi-
vidual effort.
Level 2: Repeatable. Basic project management processes are established
to track cost, schedule, and functionality. The necessary process discipline is
in place to repeat earlier successes on projects with similar applications.
adapted to the characteristics of the software project and the requirements of the
project team. Finally, umbrella activities—such as software quality assurance, soft-
ware configuration management, and measurement2—overlay the process model.
Umbrella activities are independent of any one framework activity and occur through-
out the process.
In recent years, there has been a significant emphasis on “process maturity.” The
Software Engineering Institute (SEI) has developed a comprehensive model predi-
cated on a set of software engineering capabilities that should be present as organ-
izations reach different levels of process maturity. To determine an organization’s
current state of process maturity, the SEI uses an assessment that results in a five
point grading scheme. The grading scheme determines compliance with a capability
maturity model (CMM) [PAU93] that defines key activities required at different levels
of process maturity. The SEI approach provides a measure of the global effectiveness
of a company's software engineering practices and establishes five process maturity
levels that are defined in the following manner:
Level 1: Initial. The software process is characterized as ad hoc and occa-
sionally even chaotic. Few processes are defined, and success depends on indi-
vidual effort.
Level 2: Repeatable. Basic project management processes are established
to track cost, schedule, and functionality. The necessary process discipline is
in place to repeat earlier successes on projects with similar applications.
Level 3: Defined. The software process for both management and engi-
neering activities is documented, standardized, and integrated into an organi-
zationwide software process. All projects use a documented and approved
version of the organization's process for developing and supporting software.
This level includes all characteristics defined for level 2.
Level 4: Managed. Detailed measures of the software process and product
quality are collected. Both the software process and products are quantitatively
understood and controlled using detailed measures. This level includes all char-
acteristics defined for level 3.
Level 5: Optimizing. Continuous process improvement is enabled by quan-
titative feedback from the process and from testing innovative ideas and tech-
nologies. This level includes all characteristics defined for level 4.
The five levels defined by the SEI were derived as a consequence of evaluating
responses to the SEI assessment questionnaire that is based on the CMM. The results
of the questionnaire are distilled to a single numerical grade that provides an indi-
cation of an organization's process maturity.
The SEI has associated key process areas (KPAs) with each of the maturity levels.
The KPAs describe those software engineering functions (e.g., software project plan-
ning, requirements management) that must be present to satisfy good practice at a
particular level. Each KPA is described by identifying the following characteristics:
• Goals—the overall objectives that the KPA must achieve.
• Commitments—requirements (imposed on the organization) that must be met
to achieve the goals or provide proof of intent to comply with the goals.
• Abilities—those things that must be in place (organizationally and technically)
to enable the organization to meet the commitments.
• Activities—the specific tasks required to achieve the KPA function.
• Methods for monitoring implementation—the manner in which the activities
are monitored as they are put into place.
• Methods for verifying implementation—the manner in which proper practice
for the KPA can be verified.
Eighteen KPAs (each described using these characteristics) are defined across the
maturity model and mapped into different levels of process maturity. The following
KPAs should be achieved at each process maturity level:3
Process maturity level 2
• Software configuration management
• Software quality assurance
3 Note that the KPAs are additive. For example, process maturity level 4 contains all level 3 KPAs
plus those noted for level 2.
neering activities is documented, standardized, and integrated into an organi-
zationwide software process. All projects use a documented and approved
version of the organization's process for developing and supporting software.
This level includes all characteristics defined for level 2.
Level 4: Managed. Detailed measures of the software process and product
quality are collected. Both the software process and products are quantitatively
understood and controlled using detailed measures. This level includes all char-
acteristics defined for level 3.
Level 5: Optimizing. Continuous process improvement is enabled by quan-
titative feedback from the process and from testing innovative ideas and tech-
nologies. This level includes all characteristics defined for level 4.
The five levels defined by the SEI were derived as a consequence of evaluating
responses to the SEI assessment questionnaire that is based on the CMM. The results
of the questionnaire are distilled to a single numerical grade that provides an indi-
cation of an organization's process maturity.
The SEI has associated key process areas (KPAs) with each of the maturity levels.
The KPAs describe those software engineering functions (e.g., software project plan-
ning, requirements management) that must be present to satisfy good practice at a
particular level. Each KPA is described by identifying the following characteristics:
• Goals—the overall objectives that the KPA must achieve.
• Commitments—requirements (imposed on the organization) that must be met
to achieve the goals or provide proof of intent to comply with the goals.
• Abilities—those things that must be in place (organizationally and technically)
to enable the organization to meet the commitments.
• Activities—the specific tasks required to achieve the KPA function.
• Methods for monitoring implementation—the manner in which the activities
are monitored as they are put into place.
• Methods for verifying implementation—the manner in which proper practice
for the KPA can be verified.
Eighteen KPAs (each described using these characteristics) are defined across the
maturity model and mapped into different levels of process maturity. The following
KPAs should be achieved at each process maturity level:3
Process maturity level 2
• Software configuration management
• Software quality assurance
3 Note that the KPAs are additive. For example, process maturity level 4 contains all level 3 KPAs
plus those noted for level 2.
• Software subcontract management
• Software project tracking and oversight
• Software project planning
• Requirements management
Process maturity level 3
• Peer reviews
• Intergroup coordination
• Software product engineering
• Integrated software management
• Training program
• Organization process definition
• Organization process focus
Process maturity level 4
• Software quality management
• Quantitative process management
Process maturity level 5
• Process change management
• Technology change management
• Defect prevention
Each of the KPAs is defined by a set of key practices that contribute to satisfying its
goals. The key practices are policies, procedures, and activities that must occur before
a key process area has been fully instituted. The SEI defines key indicators as "those
key practices or components of key practices that offer the greatest insight into whether
the goals of a key process area have been achieved." Assessment questions are
designed to probe for the existence (or lack thereof) of a key indicator.
• Software project tracking and oversight
• Software project planning
• Requirements management
Process maturity level 3
• Peer reviews
• Intergroup coordination
• Software product engineering
• Integrated software management
• Training program
• Organization process definition
• Organization process focus
Process maturity level 4
• Software quality management
• Quantitative process management
Process maturity level 5
• Process change management
• Technology change management
• Defect prevention
Each of the KPAs is defined by a set of key practices that contribute to satisfying its
goals. The key practices are policies, procedures, and activities that must occur before
a key process area has been fully instituted. The SEI defines key indicators as "those
key practices or components of key practices that offer the greatest insight into whether
the goals of a key process area have been achieved." Assessment questions are
designed to probe for the existence (or lack thereof) of a key indicator.